CNC aims to reduce incidents of sickness absence which resulted from musculoskeletal disorders that were caused by the nature of the its work.
Medical evidence shows that early physiotherapy intervention on musculoskeletal injuries can prevent acute conditions becoming chronic and promote swifter recovery, return to the workplace and improved productivity levels.
Looking for a solution to help its employees recover more quickly and safely from musculoskeletal injuries and conditions that required treatment, the Civil Nuclear Constabulary (CNC) turned to Physio Med to provide a robust, blended physiotherapy service.
Case Study
The CNC is the armed police force in charge of protecting civil nuclear sites and nuclear materials across the UK. It plays a key role in protecting national security, employing more than 1,500 police officers and staff whose responsibilities include safeguarding 10 civil nuclear sites in England and Scotland, as well as providing on-board armed protection for high security nuclear cargo during marine, rail and road transports.
The critical nature of the services provided by the CNC mean that many of the job roles are physically demanding, with Armed Firearms Officers and Police staff particularly prone to suffering from musculoskeletal disorders (MSDs).
Although the CNC has historically enabled employees to access physiotherapy services through their Occupational Health service, it was identified that here was a gap in provision where people with chronic, less severe conditions were not accessing the services. It is known that these chronic conditions, left untreated, have the potential to become more impactive upon the CNC due to increased sickness absence in the future as the condition develops and those employees perceive that they are working less productively than they would expect. These employees, if they requested physiotherapy via their GP, would have to wait as many as 14 weeks to access NHS physiotherapy.
As such, the CNC committed to trialling a confidential fast-track self-service physiotherapy provision for all its employees with a view to:
- Increase employee wellbeing;
- Reduce MSD-related employee discomfort and pain levels;
- Minimise associated absence and facilitate an early return to work;
- Improve productivity;
- Reduce the risk of further absence due to recurrence of MSD.
The solution
As part of a pilot scheme, the CNC tasked Physio Med with implementing a blended model of physiotherapy service.
Employees who suffer a musculoskeletal injury or disorder are referred by either self-referral or by the CNC’s Occupational Health (OH) or Management departments. The employee is then contacted by Physio Med’s team for a telephone triage, within as little as two hours and a maximum of four, to ensure they are appropriate for treatment.
Those referred with acute conditions then receive an initial assessment within an average of 1.8 days via Physio Med’s Physiotherapy Advice Line (PAL) service, whilst those suffering chronic injuries are referred directly to the face-to-face (F2F) service via a national network of clinics.
The PAL initial assessments are carried out over the phone by a Senior Chartered Physiotherapist and incorporate a series of evidence-based clinical questions and a series of movements to facilitate diagnosis. The employee is then advised on the best way to self-manage the condition, thereby assisting the physical healing process. This includes:
- Appropriate advice regarding their work station, lifestyle, medication, posture and methods of symptomatic relief;
- Realistic advice on modifying the working day to accommodate the injury;
- An individually tailored progressive exercise programme created by the physiotherapist to speed up healing, communicated via comprehensive video exercise files, and accessed via a computer, smartphone or tablet.
Employees referred directly for F2F treatment receive an appointment within an average of 2.8 days at one of 780 hand-picked practices across the UK network. Because of their geographical distribution, 98% of the UK population lives within a 30 minute journey of one of the practices, providing the CNC’s employees with easy access to physiotherapy treatment regardless of where they are stationed.
Outcome
In order for staff to be able to combat potential terrorist activity and carry out their duties to a very high standard, they need to be at work and in excellent physical health. Therefore, reducing the levels of sickness absence due to MSDs was a key driver for the CNC.
In a five month period, from May 2016 to October 2016, a total of 179 appropriate cases were progressed, with 78% suffering chronic conditions and being routed directly for face-to-face treatment, and 22% being treated via the PAL service.
At the point of referral, 16% of the employees referred were absent from work due to injury, while the remainder were at work with pain and therefore operating at a reduced average productivity level of just 66% based on their perceptions as recorded in the feedback questionnaire carried out as part of the referral, highlighting the hidden cost of presenteeism.
A total of 60% of patients on the PAL service were discharged after just ten days, as their condition had either resolved or they were able to effectively self-manage it. Employees discharged from the F2F service received an average of just over five sessions each, including the initial assessment.
Of the 179 appropriate referrals, only four remained off work following treatment and there was a reported perceived pain reduction of more than 65% amongst those who returned to work.
In financial terms, and based on the average daily cost of a CNC employee being £100, it is anticipated that the service has delivered significant returns, although it is too early to identify the real return on investment.
Although the majority of employees that accessed the service were ultimately able to remain at work and carry out their duties whilst receiving treatment, this might not have been the case had they been relying on predicted NHS timescales for treatment. Assuming that those employees that used the service would otherwise have been absent from work for a long period, or working at reduced productivity, the perceived productivity and function improvement – multiplied by the days saved in not waiting to access NHS treatment – delivers a total estimated saving of £189,750 over the five month period, which equates to an ROI figure of 8.4:1.
The early indication is that the provision of this scheme in conjunction with the other health, wellbeing and fitness service that the CNC offers is playing an important role in the Civil Nuclear Constabulary maintaining its service levels to the country.
Simon Chesterman, Deputy Chief Constable, CNC
Simon Chesterman, Deputy Chief Constable at the CNC, said: “Our officers have to pass some of the most stringent fitness tests in policing and carry out a very demanding counter terrorism role.
“The CNC is committed to supporting all our employees and the service provided by Physio Med means we are able to offer swift access to treatment for musculoskeletal disorders, meaning productivity is improved and our staff get back to full fitness in a much quicker time frame.”
Other outcomes included:
- 25% (66% to 91%) perceived improvement in productivity and;
- Average time taken to contact employee upon receiving referral of two hours 24 minutes;
- Average time to access Physio Med service of 2.4 working days v average time to access NHS physiotherapy of 71.5 working days.
What makes us susceptible to burnout?
In this episode of the Safety & Health Podcast, ‘Burnout, stress and being human’, Heather Beach is joined by Stacy Thomson to discuss burnout, perfectionism and how to deal with burnout as an individual, as management and as an organisation.
We provide an insight on how to tackle burnout and why mental health is such a taboo subject, particularly in the workplace.
About time too maybe employers now be waking-up to RSI’s contribution to 57.2 days lost days productivity across the workplace with 30 days attributed to DSE 58% of user operators CVS, presenteeism accounting for 20% or nearly 1 day in 5 due to eye-strain, Screen Fatigue, Asthenopia and more obvious WRULDS and MSD’s requiring sick leave, treat, rehabilitation just to return to the same old, same old sub-optimally ergonomically adapted DSE ???