No effective design or planning to eliminate risks from dust at some UK construction sites, HSE campaign finds
October 5, 2023
Some UK construction sites have no effective design or planning to eliminate risks from dust and the hierarchy of controls is simply not considered at all, says the regulator. Read More
New robot ‘dog’ reduces power workers’ time in confined spaces
September 1, 2023
UK Power Networks’ new robot companion has been used in trials for tunnel inspections aimed to reduce work for people in confined spaces. Read More
Figures reveal fall in construction inspections
March 9, 2016
Figures obtained by construction union UCATT have revealed a decline in the number of inspections that the Health and Safety Read More