July 26, 2018

Get the SHP newsletter

Daily health and safety news, job alerts and resources

In Court

‘Numerous safety failings’ on site puts workers at risk

HSE inspections at two construction sites revealed widespread safety failings that put workers at risk.

Sherwood Homes Limited had appointed several Principal Contractors to construct numerous domestic properties at two sites, in Preston and at Tarporley. The HSE carried out proactive inspections at both sites and found that those working on site were exposed to risks that included falls from height, electrocution, inhalation of silica dust and being struck by construction plant.

As a result of the inspections, various enforcement action was taken against the Principal Contractors involved and the Client, Sherwood Homes Limited.

The HSE investigation found that the company failed to make suitable arrangements for managing the projects. There was no F10 notice of construction work displayed, and insufficient welfare facilities at the Tarporley site. The company also failed to give notice in writing to HSE before the construction phase began at the Preston site.

On further investigation it was found that since early 2014, HSE conducted nine inspections to four separate sites developed on behalf of Sherwood Homes Ltd. During these visits, 16 enforcement notices and nine notification of contraventions were served for various health and safety breaches.

Sherwood Homes Ltd of Houldsworth Street, Stockport, were found guilty of breaching Regulation 6 (2), Regulation 6(3) and two breaches of Regulation 4 of the Construction (Design and Management) Regulations 2015. The company was fined £76,000 and ordered to pay costs of £14,651.64.

Speaking after the hearing, HSE Inspector Susan Ritchie said: “Clients cannot delegate their health and safety responsibilities. CDM 2015 places clear duties on Clients making them accountable for the impact their decisions and approach have on the health, safety and welfare of their project.

“In general terms, the Client must ensure that the construction project is set up so that it is carried out from start to finish in a way that adequately controls the risk to health and safety of those who may be affected by it. In order to achieve this they must engage others (such as Designers and Principal Contractors) that have the necessary skills, knowledge, training and organisational capabilities to fulfil their responsibilities under CDM and deliver the project safely on behalf of the Client. If the Client fails to do this, HSE will consider taking enforcement action against them.”

The Safety Conversation Podcast: Listen now!

The Safety Conversation with SHP (previously the Safety and Health Podcast) aims to bring you the latest news, insights and legislation updates in the form of interviews, discussions and panel debates from leading figures within the profession.

Find us on Apple Podcasts, Spotify and Google Podcasts, subscribe and join the conversation today!

Related Topics

Subscribe
Notify of
guest

0 Comments
Inline Feedbacks
View all comments