in court
Contractors injured doing maintenance work
An electricity power station company has been prosecuted after three contractors were injured by a sudden release of water and sludge while carrying out maintenance work at a Cheshire power station.
On 18 January 2018, three workers contracted by Keadby Generation Limited, were removing a recirculation pump for maintenance in the Flue Gas Desulphurisation area of Fiddlers Ferry Power Station in Warrington. Approximately 38.5 metres cubed of diluted slurry and associated stored energy was released while the pump was being removed, resulting in the contractors being knocked off the concrete plinth where they had been working. The trio sustained multiple fracture injuries.
The HSE’s investigation found that the pressurised contents of the pump and associated pipework had not been discharged prior to work commencing due to the drain pipe being blocked. This resulted in the release of stored energy during the removal of the pump instead of during the isolation process. Keadby Generation Ltd had failed to undertake a suitable and sufficient assessment of the hazards and risks associated with the work and had not implemented a safe system of work.
Keadby Generation Limited, of Keadby Power Station, Trentside, Keadby, Scunthorpe, pleaded guilty to breaching sections 2(1) and 3(1) of the Health and Safety at Work etc. Act 1974 and was fined £200,000 with costs of £7,163.20.
Speaking after the hearing, HSE Inspector Jane Carroll said: “This incident could so easily have been avoided if the company had identified and managed the risks involved and put a safe system of work in place.”
The Safety Conversation Podcast: Listen now!
The Safety Conversation with SHP (previously the Safety and Health Podcast) aims to bring you the latest news, insights and legislation updates in the form of interviews, discussions and panel debates from leading figures within the profession.
Find us on Apple Podcasts, Spotify and Google Podcasts, subscribe and join the conversation today!
Contractors injured doing maintenance work
An electricity power station company has been prosecuted after three contractors were injured by a sudden release of water and sludge while carrying out maintenance work at a Cheshire power station.
Barbour EHS
SHP - Health and Safety News, Legislation, PPE, CPD and Resources Related Topics
Company and contractor sentenced as failures led to evacuation in village
‘On trial’ – An immersive experience
Company and director sentenced for putting workers at risk