Company fined after a worker falls from height when platform collapses

A North-East civil engineering company has been sentenced after a worker suffered life threatening injuries after falling 15 metres when a platform he was working on unexpectedly collapsed.

Company fined after a worker falls from height when platform collapsesThe worker was involved in the dismantling of the Brent Bravo, a former North Sea oil and gas platform, on 31 July 2019, Teesside Magistrates Court was told.

Able UK Limited was contracted to dismantle four platforms from the Brent North Sea oil and gas field. The incident occurred during the removal of a module located on the north west corner of the Brent Bravo Platform. In planning for the removal of the module, it was noted that there were three platforms on the cellar deck of the structure that would need to be moved to allow the module to fall safely.

It was not recognised by the planning team that one of the platforms did not form part of the main structure and was attached to the platform using bolts that had corroded over time. This affected the structural integrity of the platform and the methodology required to remove it safely. During the cutting of bracing beams, the platform unexpectedly collapsed causing one of the employees to fall 15 metres.

An HSE investigation into the incident found that Able UK Limited failed to carry out a full structural appraisal of the platform prior to demolition. This would have informed the risk assessment and method statement being used by the cutting crew at the time of the incident to ensure that the work could have been carried out safely.

Able UK Limited of Able House, Billingham Reach Industrial Est, Haverton Hill Road, Cleveland, pleaded guilty to breaching Regulation 2(1) of The Health and Safety at Work act 1974 and was fined £200,000 with £20,991.24 costs by Teesside Magistrates Court.

After the hearing, HSE Inspector Richard Littlefair said: “When undertaking demolition work where structures are being left in a pre-weakened state, it is essential for those in control of the work to take appropriate measures to ensure the safety of all those involved with the work. This includes ensuring that consideration is given to the stability of structures before and during demolition work, as well as ensuring that control measures are in place to mitigate other associated health and safety risks such as work at height.”

The Safety Conversation Podcast: Listen now!

The Safety Conversation with SHP (previously the Safety and Health Podcast) aims to bring you the latest news, insights and legislation updates in the form of interviews, discussions and panel debates from leading figures within the profession.

Find us on Apple Podcasts, Spotify and Google Podcasts, subscribe and join the conversation today!

Related Topics

Subscribe
Notify of
guest

0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments