A construction company and its managing director have been prosecuted for operating an unsafe construction site during the conversion of a building in Bollington. The HSE said that Bluefig Development Ltd and Mr Faris Mousa completely failed in their duties to protect the workers or members of the public from harm, and that it was only luck that no one was injured or killed.

Manchester and Salford Magistrates’ Court heard how the conditions on the site, where a former pub was being changed into two houses, were so poor it prompted a member of public to complain to the local authority.

The company and its director failed to notify HSE of the project, appoint a competent principal contractor or ensure they had suitable and sufficient measures to reduce risks to workers and members of the public. – HSE

The Health and Safety Executive (HSE) inspected the site and had to stop all the work on the building as the conditions were so dangerous and putting workers lives at immediate risk.

Following inspection the HSE:

  • Served three prohibition notices and two improvements notices for safety failings that ranges from work at height issues, missing floorings with no protection and health failings including the provision of welfare facilities with running water.
  • Found an extremely unsafe wall on the property that had not been sufficiently supported to prevent it from collapsing.
  • Found that both the company and its director did not put in place effective health and safety management at the start of the conversion.
  • Found that the company and its director failed to notify HSE of the project, appoint a competent principal contractor or ensure they had suitable and sufficient measures to reduce risks to workers and members of the public.

Bluefig Development Ltd, of Dale House, 35 Dale Street, Manchester pleaded guilty to breaching Section 3 of the Health & Safety at Work etc Act 1974 and Regulation 22(1)(c) of the Construction (Design and Management) Regulations 2007, and was fined £42,900 with £3,781.24 costs.

Company Director Faris Mousa pleaded guilty to breaching two charges under Section 37 of the Health & Safety at Work etc Act 1974 and was fined £40,000 with £3,658.24 costs.

HSE inspector Deborah Walker said after the hearing: “Bluefig Development Ltd and Mr Faris Mousa completely failed in their duties to protect the workers or members of the public from harm. This was an extremely dangerous site and it is only luck that nobody was injured or even killed.  Anyone involved in construction, no matter what size of site or project has to take the health, safety and welfare of their workers seriously.  If the unstable wall had collapsed we could now be talking about the tragic death of a worker and its impact on their family rather than how lucky they are no-one was injured.”

The Safety Conversation Podcast: Listen now!

The Safety Conversation with SHP (previously the Safety and Health Podcast) aims to bring you the latest news, insights and legislation updates in the form of interviews, discussions and panel debates from leading figures within the profession.

Find us on Apple Podcasts, Spotify and Google Podcasts, subscribe and join the conversation today!

Related Topics

Subscribe
Notify of
guest

0 Comments
Inline Feedbacks
View all comments